You don't have javascript enabled. Good luck with that.
Pencarian
Sodetan Ciliwung-KBT Berfungsi Membagi Beban Air

Ciliwung-KBT Shortcut Divides Water Load

The shortcut (sodetan) of CIliwung-East Flood Canal (KBT) has function to minimize flood in Jakarta. It will divide water load from Ciliwung river to KBT.

Shortcut will divide water load from Ciliwung river to KBT

Teguh Hendarwan, Jakarta Head Dept. of Water Management, admitted Ciliwung water debit would increase during rainy season. In KBT, water debit is low.

“Shortcut will divide water load from Ciliwung river to KBT,” he said, Tuesday (5/3).

Bukit Duri Relocation to Complete End of May

Shortcut will flow water from Ciliwung river by 60 meter cubic per second to KBT. It means 10 percent of Ciliwung river load is given to KBT.

Now the project has touched at Cipinang river side, but city administration faces a law process. The project is run by central government’s BBWSCC.

“We have lost in PTUN, but we try for cassation,” he added.

According to him, the project should not be canceled because it will give benefit for citizens.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye425 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye372 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye361 personDessy Suciati
close