You don't have javascript enabled. Good luck with that.
Pencarian
Sodetan Ciliwung-KBT Berfungsi Membagi Beban Air

Ciliwung-KBT Shortcut Divides Water Load

The shortcut (sodetan) of CIliwung-East Flood Canal (KBT) has function to minimize flood in Jakarta. It will divide water load from Ciliwung river to KBT.

Shortcut will divide water load from Ciliwung river to KBT

Teguh Hendarwan, Jakarta Head Dept. of Water Management, admitted Ciliwung water debit would increase during rainy season. In KBT, water debit is low.

“Shortcut will divide water load from Ciliwung river to KBT,” he said, Tuesday (5/3).

Bukit Duri Relocation to Complete End of May

Shortcut will flow water from Ciliwung river by 60 meter cubic per second to KBT. It means 10 percent of Ciliwung river load is given to KBT.

Now the project has touched at Cipinang river side, but city administration faces a law process. The project is run by central government’s BBWSCC.

“We have lost in PTUN, but we try for cassation,” he added.

According to him, the project should not be canceled because it will give benefit for citizens.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1303 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1096 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati